Background:
History:
The Eden Prairie Library is located at 565 Prairie Center Drive in Eden Prairie, MN. Built in 1987, the building was originally designed as a grocery store and was converted to a Hennepin County Library in 2004. The facility is a 53,900 gross square foot building, situated on a 4.4 acre site with surface parking for 185 vehicles.
The Eden Prairie Library Refurbishment project (CP 1001787) will improve asset infrastructure, renovate, and modernize approximately 41,000 useable square feet of the library, including public and staff functions, to improve efficiencies and better serve current and future library patrons. In 2017, Hennepin County Library conducted community and staff engagement, providing opportunities for input and participation to understand the needs for the library renovation.
A facility condition assessment was completed in 2017 to identify the infrastructure deficiencies as well as technology, energy and accessibility requirements of the library facility. This project will repair and preserve infrastructure, improve systems, and address building code and accessibility requirements.
The 2018-2022 Capital Improvement Program (CIP) approved a total project budget of $12,114,000 for the Eden Prairie Library Refurbishment. The budget reflects a 3% reduction based on the Board amendment to the CIP in December 2017. The project’s estimated construction cost averages $141/SF with a total estimated project cost averaging $226/SF.
Current Request:
Approval is requested for the Schematic Design and to authorize the County Administrator to award a contract to the contractor offering the best value if the proposals are within the proposed budgets. In addition, approval is requested for Contract A188766 with MSR Architects for architectural and engineering services for the design development through construction administration phases for the period of May 1, 2018 through December 31, 2020 in an amount not to exceed $895,034. MSR Architects were selected by the County’s Designer Selection Committee in the Fall of 2016.
Impact/Outcomes:
This project will improve the asset infrastructure, improve customer access to library services and staff, and improve overall staff efficiencies.
Asset infrastructure improvements will:
-
Ensure long term integrity of the building systems and envelope
-
Provide a code compliant facility
-
New interior finishes, ergonomic furnishings and shelving to improve sightlines
-
Improve security and access to technology
The renovation will support Hennepin County Library’s Strategic Plan which includes the following goals for building projects:
-
Provide flexible spaces to respond to changing communities and demographics
-
Configure spaces to reflect new and broader purposes
-
Create library environment that are welcoming, safe and secure
The library will be closed during construction (Winter 2018 – Fall 2019)